Finished match drilling the tank attach brackets to the tank baffle. Riveted the brackets to the baffle with the prescibed light weight pop rivets. NEED MORE CLECOS... waiting for another 125 clecos to come in from Avery.
Also, put up the banner that Beth gave me for Christmas - hopefully not too optimistic!