Brief Description: Match Drilled Ribs and Brokedown Frame
Reamed all holes that would attach a rib to the main and rear spar. Broke down frame and drilled the 3/4" hole in the bottom of the ribs to run the conduit through. Also opened up the tooling hole near the pitot hole to accept AOA tubing then deburred all reamed holes. Dimpled the holes on the bottom of the ribs that matched the rear spar dimple. Started scuffing the surface to prepare for priming.