N2724G RV9 Build Log
' style=
Date:  1-6-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator

Had Mr. Poole from work weld up the mis drilled hole in the elevator PER VANS RECOMENDATION.

Ground down weld at home and redrilled elevator horns.