N2724G RV9 Build Log
' style=
Date:  11-7-2007
Number of Hours:  8.00
Manual Reference:  6-6
Brief Description:  Elevator - L & R Pre-assembly

Completed frame assembly for both Elevators. Steps done: 1). Placed frame in Skin and clecoed, 2). Match drilled all holes, 3). Connected Control Horns, 4). Drilled both Trailing Edge Wedges and countersunk,