KitLog pro

Powered By Kitlog Pro v2.0

Pauls Web Site
' style=
Date:  1-5-2002
Number of Hours:  280.00
Manual Reference:  7-V-0
Brief Description:  Assembly of Right and Left Wings

Work on wings performed gradually over 4 year period

Assembled right and left frames January 2002

Interior of wing coated with Zinc Chromate primer

Aeroflash strobe transformers placed in Right & Left wings.
All wiring placed through the leading edge of the Wing
' style=

right wing

right wing

' style=

Right tank in position

Right tank in position

' style=

Inside leading edge left wing

Inside leading edge left wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.