KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  8-15-2008
Number of Hours:  5.35
Manual Reference:  
Brief Description:  601 Fuselage construction (#115)

Researched aileron control torque tube forward support bearing bracket fabrication.
Marked and drilled 1 1/8" hole in torque tube forward bearing bracket.
Cut sides of forward bearing bracket to dimension and angle as detailed in prints
Placed forward bearing bracket into position then installed aileron control shaft into position.
Leveled aileron support shaft and forward support bracket as detailed in instructions.
Marked and drilled rivet holes through forward bearing bracket
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.