Brief Description: 601 Fuselage construction (#115)
Researched procedures for installing baggage floor. Marked out rivet spacing on ribs and spars. Drilled #30 holes through spars and ribs. place baggage floor into position. Back drilled holes through ribs, spars and baggage floor .