KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  8-11-2008
Number of Hours:  7.37
Manual Reference:  
Brief Description:  601 Fuselage construction (#115)

Researched procedures for installing baggage floor.
Marked out rivet spacing on ribs and spars.
Drilled #30 holes through spars and ribs.
place baggage floor into position.
Back drilled holes through ribs, spars and baggage floor .
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.