Brief Description: Finished right wingtip and started installing wiri
The wingtips were disassembled, deburred, and primed. The channel was rivited to the wing skins and the fiberglass tip was riveted to the lower half of the nose skin. The right strobe light was riveted in place on the fiberglass tip along with the required aluminum backing plate. The transformer was located and bolted into place. Holes for the wiring conduit have been drilled 2" down and 2" back from the top of the spar. Black conduit like is used in Van's kits is being installed.