KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  6-9-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left wing leveled with solid blocks, nose skin ins

The left wing was leveled with solid wood blocks per the instructions, the tie-down ring installed, the nose ribs riveted in place (except for NR#4 which needs to be loose for the tank installation), and the nose skin was mounted in place and drilled. The standard pitot tube is being replaced with a Dynon pitot/AOA installation. The cutout for the mounting column was roughed in place.
' style=

Left wing leveled to 9 degrees with solid jigs

Left wing leveled to 9 degrees with solid jigs

' style=

Nose skin drilled to lower ribs

Nose skin drilled to lower ribs

' style=

Tie-down ring installed

Tie-down ring installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.