Brief Description: Left wing leveled with solid blocks, nose skin ins
The left wing was leveled with solid wood blocks per the instructions, the tie-down ring installed, the nose ribs riveted in place (except for NR#4 which needs to be loose for the tank installation), and the nose skin was mounted in place and drilled. The standard pitot tube is being replaced with a Dynon pitot/AOA installation. The cutout for the mounting column was roughed in place.