KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-22-2007
Number of Hours:  0.75
Manual Reference:  
Brief Description:  Stab spar assembly begins

After finishing as much on the rudder skeleton as I could (waiting for the replacement rear rudder skin that was damaged in shipping) I shifted over to working on the stabilizer. I pulled out the front stab spar parts, peeled the labels, and marked the centerlines. I clamped them into position, ready for drilling and then decided to call it a day.
' style=

Front spar doublers

Front spar doublers

' style=

Ready for drilling

Ready for drilling

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.