KitLog pro

Powered By Kitlog Pro v2.0

Paul's Zenith 601-XL
' style=
Date:  9-25-2008
Number of Hours:  4.03
Manual Reference:  
Brief Description:  601 Fuselage construction (#115)

Layed out upper aft skin into position.
Marked out and drilled rivet spacing on Longerons.
Back drilled through longerons and ribs into skin.
Upsized holes to final size.
Researched installation of forward mid upper skin and support tubes
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.