Put BNC connector on radio wire end. Tested antenna wiring and antenna. Clecoed the belly pan in place. Installed landing gear mains. Drilled out rivet on the header tank to install the A-brace braces. Reinstalled the header tank. Moved the nise filter for the intercomm because it was in the way of the bellypan, Installd brake fluid lines to the master cyclinder.