It seems like I should have been much faster at this but I must work slow. I cleacoed the F866A and 866B bulkhead into place. Installed AN8334D fittings into F866D bracket Plumbed brake lines from AN fittings, through the right and left gear towers per plans. Installed AN8334D bulkhead fittings through the F822 floor, torqued and flared and installed AN fittings. Installed VA107 brake fluid reservoir. Installed F2721 nylon tee I will install nylon hoses when I install the rudder pedal assembly