KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  2-21-2014
Number of Hours:  2.30
Manual Reference:  
Brief Description:  Forward Fuselage

After parts had time to dry, cleaned up the shop and prepared to make final fuselage assembly.
Clecoed F843 longerons to F822 forward floor panel.
Installed two AN3 screws and four AN3 bolts on each side and torqued bolts nuts to 25 inch pounds per torque chart.
Riveted both longerons to F822 forward sloor panel per plans
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.