KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  12-30-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Main Gear

Used my 12" #40 drill to drill the pilot hole for the cotterpin. I put some green masking tape around the bearing seal to keep the cuttings off of it. After drilling the pilot hole i removed the wheel and reinstalled the retaining nut and final drilled the hole to #30.
Cleaned all of the cuttings and reinstalled the wheels. Torqued the bearinsg per plans and set the cotterpin in place.
Repeated the process for the other side.
Installed the brake calipers and torqued the bolts to 100 inch pounds and put torque seal on bolts.
Took some time to look over the steps I will need to take to install the brake lines to brake calipers. Plan on researching wire braided hose at both ends.
' style=

Drilling the cotterpin hole

Drilling the cotterpin hole

' style=

Cotterpin installed

Cotterpin installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.