Final drilled attach holes in sliding rail assembly to #30 Deburred and cleaned up edges and cuttings Clecoed canopy back onto sliding frame and temproarily riveted 12" spaces per plans Marked and drilled #40 hole on bottom rail and vertical ribs Blocked canopy open per plans with 0.125 piece of scrap aluminum Trimed skirt per plans to within 1/4" of scribe lines Taped in place until next session at which time I will secure final fit