Taped baggage door in place and match drilled the hinge holes Dissasembled and deburred parts. Removed hinge pin and clecoed half of hinge back to fuselage and riveted in place. Installed hinge pin and checked for clearance. Started looking at the installation of the F-873 latch blocks for another day