KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  3-9-2012
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Leading Edge

Assembled the leading edge per plan and clecoed onto the main spar
Located the joint plate and clecoed it into place and match drilled the leading edge ribs and joint plate per plans.
Prepared to start on the tank
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.