KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  12-29-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Ailerons

Clecoed and match drilled the nose ribs to the spar
Insured alignment of the ribs and clecoed and match drilled them to the 705 main spars.
Clecoed the leading edge and the trailing edge to the spar with the counterbalance pipe in place. Opened counterbalnce pipe attach holes to #30. Once everything was aligned I removed the trailing edge and gained access to the counterbalance attach hole with the long bit per plans.
Disassembled and deburred, dimpled and machine countersunk per plans the counterbalance pipe, and primed parts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.