Finished the riveting and sealing of the ribs in the left tank. Riveted the tank attach bracket to the inboard rib. Installed flop tube and sealed the ends with proseal. Installed the vent tube per plans. Drilled hole in rear baffle for float sender and prepared to close up tank. Will rivet and seal tank in next session.