KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  3-28-2009
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Left Fuel Tank

Finished the riveting and sealing of the ribs in the left tank.
Riveted the tank attach bracket to the inboard rib.
Installed flop tube and sealed the ends with proseal.
Installed the vent tube per plans.
Drilled hole in rear baffle for float sender and prepared to close up tank.
Will rivet and seal tank in next session.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.