After a lengthy break I was able to get back into the shop. I used the break and bent the trailing edge of elevator. Assembled the right elevator spar and then assembled the counterbalance ribs and counterbalance skin. Drilled the lead counterbalance weight using the holes in the counterbalance skin. Set the counterweight aside and attached the counterbalance assembly to the elevator spar. Clecoed the skin to the sub assembly and clecoed and match drilled the elevator horn into place. Prepared to match drill the skin and called it an evening.
Clecoed and drilled the reinforcement plates and nut plates
Subassembly clecoed, match drilled and skin attached