KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  5-24-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Air Filter Box

Installed the new plate to the fuel servo and then clamped the bottom part of ari filter box. Installed lower cowling and lined up the filter box to the air scoop. Made marks for drilling attach holes and then removed cowling and air box assembly. Drilled holes for attaching plate to airbox. Fabricated brackets and drilled them to the airbox assembly. Countersunk and clecoed nut plates, air filter retaining clips to the air filter box plate and riveted them in place.
Mounted the top plate to the fuel servo. Bolted airbox assembly to the top plate. Installed lower and upper cowling to get measurments for the scoop-to-airbox assembly.
' style=





' style=

The top plate will need to be bent up

The top plate will need to be bent up

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.