KitLog pro

Powered By Kitlog Pro v2.0

Tommys RV8 Site
' style=
Date:  5-30-2019
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuel Injection

Installed the fuel fittings on the spider. Safety wired bolts on fuel injection servo. Laid up a layer of fiberglass on the outside of the air scoop tunnel around the joint area.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.