KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-10-2008
Number of Hours:  3.00
Manual Reference:  page 11
Brief Description:  Rudder Prep

Making the shape of the rudder leading edge using bender. It took quite awhile to do the shaping and lot of strength. The bent leading edge was then match with the line drawn on the plywood. The 3 1/4 x 0.032 tubing was placed on the line drawn & the rudder leading edge was then put in place. Perfect match.

The top end of the vertical tube for the rudder was hammered into shape to fit in the leading edge top end.
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.