KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  7-19-2003
Number of Hours:  6.20
Manual Reference:  
Brief Description:  Fuselage Jig Preparation

Continued to place a wooden block at the cockpit area and lining up the wooden block along the drawn fuselage line on the table top. Wooden block was than nailed once satisfied. The fuselage side was put up between the wooden block and using a double right angle ruler to align the fuselage straight up. Alignment took quite some time. The fuselage side was than held to the pillar for a firm attachment.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.