KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  7-13-2003
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuselage Jig Preparation

Jig prepartion for the fuselage. A line depicting the tubing size was drawn parallel to the fuselage line drawn earlier. A wooden block was placed at the table side around the cockpit area to hold the fuselage..
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.