KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  12-30-2007
Number of Hours:  3.00
Manual Reference:  page 6
Brief Description:  Horizontal Stab Prep

Again alignment of the vertcal stab for its correct positioning. The one foot steel tube was placed inside the longer horizontal tube and positioned it correctly. Alignment was made using steel ruler, string and eye balling. The string was used again and again to ensure the correct distance between its end and the vertical stab. All measurement is in equidistance.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.