KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  2-29-2004
Number of Hours:  6.60
Manual Reference:  page 3
Brief Description:  Fuselage Front

Continued working on the 1/2" x 0.035" tubing and after trimming the diagonal end it fit nicely. For alignment of the tube a marking was made at the fuselage side and the diagonal tube. Another 1/2" x 0.035" tube was cut for the aft side of the front floor, trimmed it nicely and it fit without any problem. Once completed, an alignment was made for the V shape tube at the front end. It took quite a while to check on the alignment ( about an hour or so). A tube was than cut and trimmed. It was a hard work to trim both tube for the V shape. After all the hard work it fit nicely. NOTE: The tubing at the aft cockpit floor does not in alignment with its pair. To repair before proceeding with tack weld. THE FRONT PORTION IS READY FOR TACK WELD.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.