Lay the upper and lower longeron for the second frame using the prepared jig. One side of the wooden block at each tubing location was removed so that the remaining wooden block is used to ensure a correct positioning the same as the first completed frame. The vertical at the front end of the fuselage (engine attachment) was completed.