KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  5-4-2003
Number of Hours:  4.00
Manual Reference:  page 3
Brief Description:  Fuselage tack weld

All tube connection was rechecked to ensure proper fitting. Tack weld done starting from the square tube forward and then rearward of the fuselage. Note. Pre heat the area before welding and than slowly heat the filler rod at the lower or upper longeron and than bring slowly the filler to the diagonal longeron back and forth for a good tack weld. KEEP the torch moving otherwise it will burnt a hole. Ensure the area to be welded is about 1/16" from the white flame tips.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.