Brief Description: Hor stab, elevator & rudder prep
Checking the horizontal stab and the elevator ribs and found the ribs are not properly in line. Cut the tack weld and adjusted the ribs. To tack weld later. Both end of the horizontal stab and elevator was slowly hammered to ensure the main tubing and its leading edges fit nicely before doing a proper welding. Did not proceed with the work due to fever.