KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  1-10-2009
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Hor stab, elevator & rudder prep

Checking the horizontal stab and the elevator ribs and found the ribs are not properly in line. Cut the tack weld and adjusted the ribs. To tack weld later. Both end of the horizontal stab and elevator was slowly hammered to ensure the main tubing and its leading edges fit nicely before doing a proper welding. Did not proceed with the work due to fever.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.