Powered By Kitlog Pro v2.0
MAT ISAs Web Site
Sonerai II (Original)
All
6-28-2004
< Previous Log Entry
Next Log Entry >
Date:
6-28-2004
Number of Hours:
0.30
Manual Reference:
Brief Description:
Tail Area checking
The upper fuselage frame diagonal between sta 73 3/8 and 115 3/8 and the horizontal tube (floor) at sta 154 3/8 need to re tack. Both tubing are than firmly held to get ready for the next re tacking.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonerai II (Original) Home
Category
# Logs
# Hours
All
155
521
Empennage
27
69
Fuselage
75
270
Miscellaneous
37
114
Welding
16
68
Copyright © 2001-2024 Matronics. All Rights Reserved.