KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project
' style=
Date:  10-3-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cowling oil door, air box inlet

Cut the oil door opening in the upper cowling. I had already laid up the door before the cut, so I put my last coat of filler on the top before I fit it to the opening. Also attached the custom airbox transition to the airbox. It still needs a bit of fairing on the inside to smooth out the surface.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.