KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project
' style=
Date:  11-25-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Installed control column pushrod, brakes.

Installed the control column pushrod from the control column to the bellcrank. Started working on the brake installation. Practicing bending and flaring the 1/4" aluminum tubing that is used for the brake and fuel vent lines.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.