KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project
' style=
Date:  9-6-2010
Number of Hours:  6.50
Manual Reference:  
Brief Description:  F635 Bellcrank, 712 bulkhead

Finished building, priming and installing the bellcrank assembly. built the rear tiedown and installed it in the rear 712 bulkhead.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.