Powered By Kitlog Pro v2.0
CH650 in the high desert
Zodiac 650
All
5-5-2009
< Previous Log Entry
Next Log Entry >
Date:
5-5-2009
Number of Hours:
2.50
Manual Reference:
Brief Description:
Elevator Hinge Installation
Installed the elevator hinge on the horizontal stabilizer. I also drilled out each end of the hinge and safety wired the pin.
elevator hinge installation
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 650 Home
Category
# Logs
# Hours
All
32
111
Empennage
15
64
Engine
5
6
Miscellaneous
1
0
Wings
10
36
Work Area
1
5
Copyright © 2001-2024 Matronics. All Rights Reserved.