KitLog pro

Powered By Kitlog Pro v2.0

OLEKSANDR'S WEB SITE
' style=
Date:  11-19-2014
Number of Hours:  0.75
Manual Reference:  08-06
Brief Description:  Step #2 and #3 Modifying Ribs

Opened aft flange on the 2 - HS-905 Nose ribs by 10 deg using hand seamer. Also, opened aft flange on the 2 - HS - 1004 Inspar ribs by 10 deg. On the same inspar ribs bent forward flange by 12.5 deg, and made 2.5 deg bend between forward notches.
' style=

Modified forward flanges

Modified forward flanges

' style=

Modified rear flanges

Modified rear flanges

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.