KitLog pro

Powered By Kitlog Pro v2.0

OLEKSANDR'S WEB SITE
' style=
Date:  7-16-2015
Number of Hours:  2.00
Manual Reference:  09-08
Brief Description:  Steps #1 - 6 Drilling and assembling Left Elevator

Did all steps on the page. Drilled all required holes without any problems. Marked trailing edge to match the thickness of the fairing, then used bench grinder to reduce profile. Worked out about 7/10 because it was hard to make it smooth with grinder, other side will try to do it with file. Also did Steps #1 and 2 on Page 09-09.
' style=

Attached tip rib assembly

Attached tip rib assembly

' style=

Marked Trailing Edge

Marked Trailing Edge

' style=

Trailing edge with reduced profile

Trailing edge with reduced profile

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.