Powered By Kitlog Pro v2.0
Legal Eagle
Legal Eagle
Covering
12-21-2016
< Previous Log Entry
Next Log Entry >
Date:
12-21-2016
Number of Hours:
20.50
Manual Reference:
Brief Description:
Second wing
Lower skin fabric cut, Hotmelt applied then ironed to the leading and trailing edges and heat shrunk. Upper skin being prepared.
The second wing is now finished.
Left wing
Hotmelt applied
Finished
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Legal Eagle Home
Category
# Logs
# Hours
All
213
677
Assembly
8
31
Covering
21
89
Empennage
9
42
Engine
12
24
Engine Mount
8
29
Flight Controls
13
32
Fuel System
9
20
Fuselage
40
119
Instruments
1
4
Introduction
1
1
Landing Gear
25
64
Miscellaneous
1
1
Paint
1
1
Propeller
1
1
Weight and Balance
5
7
Wings
58
212
Copyright © 2001-2024 Matronics. All Rights Reserved.