
|

|

|
Date: 9-1-2016
|
Number of Hours: 3.00
|
Manual Reference:
|
Brief Description: Floorboard tabs
|

|
The plans call for 6 tabs with only 1 on the right hand side according to the drawings. Not sure why. I have 2 on both sides and at station 2 and at station 1 I have a tab in each corner. To hold the tabs level for welding I had to create a holding platform out of 5/8" tube with a channel ground out of it which makes it easy to clamp to the round fuselage tube. The tab sits on top and a scrap piece of steel holds it level for tacking a weld.
|

|
Channel
|

|
Held
|

|
Done
|

|
|

|

|

|
|

|

|
Copyright © 2001-2020 Matronics. All Rights Reserved. |