
|

|

|
Date: 7-26-2016
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: Cluster tube cutting and tacking
|

|
The diagonals from the seatback down the base of station 2 are cut and tacked as well as the 5/8" tubes which go to the top longeron. Precise cutting and fishmouthing has made the tack welding a breeze.
|

|
To station 2
|

|
To top longeron
|

|
Day finished
|

|
|

|

|

|
|

|

|
Copyright © 2001-2020 Matronics. All Rights Reserved. |