KitLog pro

Powered By Kitlog Pro v2.0

Legal Eagle
' style=
Date:  2-2-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Set up continues

I plan to run the engine in 3 days so have torqued the AN5 prop bolts to 14ft lbs and will let it settle for a few days then will torque to the final 15ft lbs before starting.
The oil pressure line is now in and connected. No use of tape is recommended or required. The threads are NPT which are tapered and hold a good seal when tightened.
The earth lead I have run at the moment from the cylinder head back to the fuselage as the engine is electrically isolated by the rubber bushings. I have earthed the Tiny Tach to the same point on the fuselage.
All lines at this stage are temporary as the engine will be removed after the run in period and the fuselage painted.
' style=

Torqued

Torqued

' style=

Oil pressure

Oil pressure

' style=

Earth lead

Earth lead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.