
|

|

|
Date: 5-12-2016
|
Number of Hours: 2.00
|
Manual Reference:
|
Brief Description: Rib jg
|

|
Pre drilled each nose rib with 2 pilot holes. 3/16" dia.
Screwed up from under the bench through the first 2 which are already shaped and into the 3 above. The router bearing sits on the bottom 2 and routes the top 3 to shape.
|

|
Pre drill
|

|
Screwed from below
|

|
Router
|

|
|

|

|

|
|

|

|
Copyright © 2001-2020 Matronics. All Rights Reserved. |