KitLog pro

Powered By Kitlog Pro v2.0

SAM'S WEB SITE
' style=
Date:  4-18-2011
Number of Hours:  2.20
Manual Reference:  
Brief Description:  Installed left tank and leading edge

Tonight my friend and instigator, Steve Ashby, came over and helped me rivet the left leading edge to the spar. It just couldn't be done by one person without using blind rivets in some locations, 'twas difficult enough for two. After that, we installed the left fuel tank, and started all the screws at the perimeter of the tank, and the bolts from the back of the spar to the pump support angles. Later I came back down and tightened all the screws and torqued the bolts to the attachment angles.

I started riveting the leading edge skin to the spar, but ran out of steam.
' style=

Front rib to spar rivets inside the leading edge.

Front rib to spar rivets inside the leading edge.

' style=

Fuel tank installed for the last time, to stay.

Fuel tank installed for the last time, to stay.

' style=

Top of leading edge, partially riveted.

Top of leading edge, partially riveted.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.