KitLog pro

Powered By Kitlog Pro v2.0

Pietenpol Air Camper
' style=
Date:  5-21-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Preparation for battens

I preparedthe fuselage for the side and bottom battens. Bottom will have two battens to allow for a hatch below the elevator bellcrank.
' style=

Preparation for battens

Preparation for battens

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.