Powered By Kitlog Pro v2.0
Pietenpol Air Camper
Pietenpol Air Camper
Fuselage
5-19-2009
< Previous Log Entry
Next Log Entry >
Date:
5-19-2009
Number of Hours:
4.00
Manual Reference:
Brief Description:
Right side (with door)
I had to move the project to a new workshop. 40 minutes from my home. Later it did not prove practical. The space was excellent but driving back and forth was not.
Fuselage right side
Here door opening is visible.
Right side on bench
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Gyrocopter Home
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
461
1041
Controls
32
60
Covering
1
2
Empennage
67
78
Engine
36
68
Fittings
1
1
Fuselage
98
310
Instruments
9
14
Intro
1
Landing Gear
21
38
Miscellaneous
5
18
Plumbing
12
23
Prop
8
9
Shop Supplies
3
9
Wings
167
411
Copyright © 2001-2024 Matronics. All Rights Reserved.