Powered By Kitlog Pro v2.0
Pietenpol Air Camper
Pietenpol Air Camper
Landing Gear
10-23-2015
< Previous Log Entry
Next Log Entry >
Date:
10-23-2015
Number of Hours:
1.00
Manual Reference:
Brief Description:
Landing gear jig
I made a frame to build the landing gear on. I figured out the fuselage landing gear attachment angles from my cad drawings. I think it is better than carrying the fuselage for 100 miles to the factory where I work.
Landing gear jig
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Gyrocopter Home
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
461
1041
Controls
32
60
Covering
1
2
Empennage
67
78
Engine
36
68
Fittings
1
1
Fuselage
98
310
Instruments
9
14
Intro
1
Landing Gear
21
38
Miscellaneous
5
18
Plumbing
12
23
Prop
8
9
Shop Supplies
3
9
Wings
167
411
Copyright © 2001-2024 Matronics. All Rights Reserved.