Powered By Kitlog Pro v2.0
Pietenpol Air Camper
Pietenpol Air Camper
All
8-13-2015
< Previous Log Entry
Next Log Entry >
Date:
8-13-2015
Number of Hours:
3.00
Manual Reference:
Brief Description:
Fuselage construction start
I finally (re)started fuselage construction after 5 years interval. This is the fourth workshop. Guys finished the construction of a Goat Glider (Mike Sandlin) so, I have space now.
Pictures show fuselage right side on the bench.
Mixing epoxy
Fuselage right side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Gyrocopter Home
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
461
1041
Controls
32
60
Covering
1
2
Empennage
67
78
Engine
36
68
Fittings
1
1
Fuselage
98
310
Instruments
9
14
Intro
1
Landing Gear
21
38
Miscellaneous
5
18
Plumbing
12
23
Prop
8
9
Shop Supplies
3
9
Wings
167
411
Copyright © 2001-2024 Matronics. All Rights Reserved.