KitLog pro

Powered By Kitlog Pro v2.0

Matt & Val's 650B
' style=
Date:  5-13-2021
Number of Hours:  1.00
Manual Reference:  Engine
Brief Description:  Finished 5th bearing install

Finished drilling the new pin holes
removed the cover and deburred everything.
Tapped in the new pins into the case
applied anerobic sealant per conversion manual and reinstalled 5th bearing.
torqued all bolts per specs listed.
installed alternator bracket (black piece)
' style=

Drilling bottom pin hole

Drilling bottom pin hole

' style=

5th bearing final torqued

5th bearing final torqued

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.