Powered By Kitlog Pro v2.0
Matt & Val's 650B
CH-650B
All
5-13-2021
< Previous Log Entry
Next Log Entry >
Date:
5-13-2021
Number of Hours:
2.00
Manual Reference:
Brief Description:
Drilling new pin holes thru 5th bearing
Using the 5th bearing install kit from SPA.
Followed the instructions in the SPA build manual and WW conversion manual.
step drilled up to final size
Drill guides installed
drilling the new dowell pin holes
Drilling the pin holes
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH-650B Home
Category
# Logs
# Hours
All
245
450
Electrical / Lights
3
8
Elevator
8
4
Engine
43
84
Flaps / Ailerons
27
47
Horizontal Stabalize
9
18
Kit Receipt / invent
4
18
Rudder
5
19
Rudder Workshop
5
19
Tools
12
16
Wings
117
197
Work benches
2
8
Work benchs
2
8
Workshop
8
4
Copyright © 2001-2024 Matronics. All Rights Reserved.